SOSCEx Dec15 * SG574 * Dive index * Mission links
Based on low voltage useage over previous 12 dives:
    dives remaining   : 304 (47.3 days at current dive duration)
    projected end date: 22-Jun-2016 04:10:55 (to 15% capacity)

Based on high voltage useage over previous 12 dives:
    dives remaining   : 777 (121.0 days at current dive duration)
    projected end date: 03-Sep-2016 19:53:17 (to 15% capacity)

High voltage pack usage


Low voltage pack usage