Shilshole 26Jul16 * SG219 * Dive index * Mission links
Based on high voltage useage over previous 5 dives:
    dives remaining   : 1709 (56.9 days at current dive duration)
    projected end date: 21-Sep-2016 20:22:56 (to 15% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 1709 (56.9 days at current dive duration)
    projected end date: 21-Sep-2016 20:22:56 (to 15% capacity)

High voltage pack usage


Low voltage pack usage