DavisStrait May07 * SG001 * Dive index * Mission links * Dive 808 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 40.77 of 91.80 AH used of 24V (55.59% remains)
• Previous NAKs 0, Timeouts 0 • 16.44 of 61.20 AH used of 10V (73.13% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 6.4 m at 4.8 m depth, ceiling -1.6 m
• GPS1 time: 20 s
• GPS2 time: 27 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
55 - - - 150 done -1.07 - - 612 - - - 3132 - -121.6 -87.35 - 2733 - - - - - - - - - - -
157 2.0 -2.0 11 178 roll -1.07 6.70 - 2062 216.4 4.62 - 618 -544.2 -121.6 - - 2296 - - - - - - - - - - -
308 15.0 2.9 28 443 done -0.25 0.85 - 2280 256.5 - - 2535 - - 93.50 0.001 2262 -0.4 0.565 - - - - - - - - -
449 18.7 - 43 644 VBD 1.07 1.23 - 2556 224.4 - - 2533 - 121.6 139.48 0.001 1880 -2.7 5.301 - - - - - - - - -
SM 0.34 - - - - -7.37 - - 659 - - - 2098 - 200.66 66.07 - 1452 -6.5 INF - - - - - -