DavisStrait May07 * SG001 * Dive index * Mission links * Dive 711 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 35.66 of 91.80 AH used of 24V (61.15% remains)
• Previous NAKs 2, Timeouts 0 • 14.73 of 61.20 AH used of 10V (75.92% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.3 m at 5.1 m depth, ceiling 2.8 m
• GPS1 time: 19 s
• GPS2 time: 32 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 620 - - - 2033 - -121.6 -43.58 - 2766 - - - - - - - - - - -
101 0.5 -0.4 6 121 roll -1.07 7.43 - 2098 198.9 2.55 - 725 -512.9 -121.6 - - 2769 - - - - - - - - - - -
257 15.1 5.7 24 369 done -0.25 0.70 - 2268 242.9 - - 2447 - - 99.93 0.001 2259 -5.1 7.976 - - - - - - - - -
376 20.4 - 37 490 roll 1.07 1.30 - 2530 201.5 2.72 - 3784 491.5 121.6 98.20 0.001 1769 -5.0 10.536 - - - - - - - - -
SM 0.34 - - - - -7.54 - - 608 - - - 2101 - 200.41 50.03 0.001 1445 -6.5 0.225 - - - - - -