PortSusan 09Nov10 * SG034 * Dive index * Mission links * Dive 3 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 4.10 of 151.00 AH used of 24V (97.28% remains)
• Previous NAKs 3, Timeouts 3 • 2.11 of 122.20 AH used of 10V (98.27% remains)
• Surface angle -61.8 deg, depth 1.02 m • Intended pitch -17.5 deg, speed -10.000 cm/s
VBD pumped to 975.34 (beyond SM_CC=970) • surface range 19.3 m at 19.1 m depth, ceiling -0.2 m
• GPS1 time: 8 s
• GPS2 time: 11 s • Transponder ping count: 3
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
12 end surface: CONTROL_FINISHED_OK
12 begin dive
14 - - - 191 VBD -1.27 - - 356 - - - 2032 - -146.6 -173.65 - 1774 - - - - - - - - - - -
193 3.4 -2.7 30 336 roll -1.27 9.07 0.174 1894 169.6 2.35 0.089 3435 597.0 -146.6 -124.07 - 3952 -17.6 - - - - - - - - - -
587 22.1 -4.1 94 595 done -1.27 - - 1893 - 2.35 0.079 2017 -603.4 -146.6 - - 3952 - - - - - - - - - - -
721 28.5 -4.9 107 722 done -1.27 - - 1894 - - - 2017 - -146.6 - - 3952 - - - - - - - - - - -
849 34.9 -5.4 119 853 roll -1.27 - - 1894 - 2.35 0.104 624 -592.8 -146.6 - - 3952 - - - - - - - - - - -
909 end dive: HALF_MISSION_TIME_EXCEEDED
909 begin apogee
915 38.1 5.4 124 1027 done -0.31 1.08 0.117 2105 195.4 - - 2052 - - 106.03 0.802 3455 -4.7 0.027 - - - - - - - - -
1027 end apogee: CONTROL_FINISHED_OK
1028 begin climb
1029 38.9 - 134 1145 roll 1.27 1.73 0.094 2453 201.2 2.50 0.102 619 -573.2 146.6 107.47 0.770 2958 -4.6 0.029 - - - - - - - - -
1251 10.8 16.5 159 1258 done 1.27 - - 2453 - 2.22 0.070 2036 638.3 146.6 - - 2960 - - - - - - - - - - -
1326 7.9 -2.4 172 1526 roll 1.60 0.30 0.082 2535 273.3 2.35 0.089 3409 584.3 416.1 192.68 0.750 2046 -4.7 0.006 - - - - - - - - -
1699 end climb: NO_VERTICAL_VELOCITY
1700 begin surface
SM 1.03 - - - - -8.28 10.77 0.082 356 -202.3 - - 2026 - 975.93 - - 148 - - - - - - - -