SOSCEx Sep13 * SG543 * Dive index * Mission links
Based on high voltage useage over previous 6 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 11-Sep-2013 08:05:25 (to 5% capacity)

Based on high voltage useage over previous 6 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 11-Sep-2013 08:05:25 (to 5% capacity)

High voltage pack usage


Low voltage pack usage