Shilshole 02Sep20 * SG527 * Dive index * Mission links
Based on low voltage usage over previous 6 dives:
    dives remaining   : 638 (18.9 days at current dive duration)
    projected end date: 21-Sep-2020 19:40:28 (to 15% capacity)

Based on low voltage usage over previous 6 dives:
    dives remaining   : 638 (18.9 days at current dive duration)
    projected end date: 21-Sep-2020 19:40:28 (to 15% capacity)

High voltage pack usage


Low voltage pack usage