Shilshole 29Mar22 *
SG247 *
Dive index
* Mission links
Based on high voltage usage over previous 5 dives:
dives remaining : 2729 (97.9 days at current dive duration)
projected end date: 05-Jul-2022 18:02:59 (to 15% capacity)
Based on high voltage usage over previous 5 dives:
dives remaining : 2729 (97.9 days at current dive duration)
projected end date: 05-Jul-2022 18:02:59 (to 15% capacity)
Based on fuel gauge from combined packs over previous 5 dives:
dives remaining : 2580 (92.5 days at current dive duration)
projected end date: 30-Jun-2022 09:58:52 (to 15% capacity)
High voltage pack usage
Low voltage pack usage