Shilshole 28Jun17 * SG203 * Dive index * Mission links
Based on high voltage useage over previous 6 dives:
    dives remaining   : 1361 (44.8 days at current dive duration)
    projected end date: 12-Aug-2017 16:20:39 (to 15% capacity)

Based on low voltage useage over previous 6 dives:
    dives remaining   : 1480 (48.7 days at current dive duration)
    projected end date: 16-Aug-2017 14:22:54 (to 15% capacity)

High voltage pack usage


Low voltage pack usage