Shilshole 25May16 * SG201 * Dive index * Mission links
Based on high voltage useage over previous 6 dives:
    dives remaining   : -999 (-23.1 days at current dive duration)
    projected end date: 30-Apr-2016 18:18:59 (to 15% capacity)

Based on low voltage useage over previous 6 dives:
    dives remaining   : 21 (0.5 days at current dive duration)
    projected end date: 24-May-2016 09:21:39 (to 15% capacity)

High voltage pack usage


Low voltage pack usage