Based on low voltage useage over previous 4 dives:
    dives remaining   : 938 (29.2 days at current dive duration)
    projected end date: 29-Mar-2012 03:35:32 (to 5% capacity)

Based on high voltage useage over previous 4 dives:
    dives remaining   : 1043 (32.5 days at current dive duration)
    projected end date: 01-Apr-2012 10:04:20 (to 5% capacity)

High voltage pack usage


Low voltage pack usage