Based on high voltage useage over previous 10 dives:
    dives remaining   : 1021 (50.3 days at current dive duration)
    projected end date: 02-Jan-2011 14:52:14 (to 5% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 1475 (72.6 days at current dive duration)
    projected end date: 24-Jan-2011 23:31:26 (to 5% capacity)

High voltage pack usage


Low voltage pack usage