Shilshole 06Apr22 *
SG180 *
Dive index
* Mission links
Based on high voltage usage over previous 2 dives:
dives remaining : 1528 (35.8 days at current dive duration)
projected end date: 12-May-2022 14:38:30 (to 15% capacity)
Based on high voltage usage over previous 2 dives:
dives remaining : 1528 (35.8 days at current dive duration)
projected end date: 12-May-2022 14:38:30 (to 15% capacity)
Based on fuel gauge from combined packs over previous 2 dives:
dives remaining : 669 (15.7 days at current dive duration)
projected end date: 22-Apr-2022 11:56:13 (to 15% capacity)
High voltage pack usage
Low voltage pack usage