Shilshole 01Aug19 * SG178 * Dive index * Mission links
Based on high voltage useage over previous 1 dives:
    dives remaining   : 2043 (43.4 days at current dive duration)
    projected end date: 14-Sep-2019 04:15:53 (to 15% capacity)

Based on high voltage useage over previous 1 dives:
    dives remaining   : 2043 (43.4 days at current dive duration)
    projected end date: 14-Sep-2019 04:15:53 (to 15% capacity)

High voltage pack usage


Low voltage pack usage