Shilshole 15Jan13 * SG171 * Dive index * Mission links
Based on high voltage useage over previous 7 dives:
    dives remaining   : 9 (0.3 days at current dive duration)
    projected end date: 16-Jan-2013 06:04:38 (to 5% capacity)

Based on low voltage useage over previous 7 dives:
    dives remaining   : 2132 (65.5 days at current dive duration)
    projected end date: 22-Mar-2013 12:07:36 (to 5% capacity)

High voltage pack usage


Low voltage pack usage