OKMC Aug12 * SG165 * Dive index * Mission links
Based on high voltage useage over previous 10 dives:
    dives remaining   : 162 (28.6 days at current dive duration)
    projected end date: 30-Sep-2012 22:27:38 (to 5% capacity)

Based on low voltage useage over previous 10 dives:
    dives remaining   : 695 (122.8 days at current dive duration)
    projected end date: 03-Jan-2013 03:15:15 (to 5% capacity)

High voltage pack usage


Low voltage pack usage