PLUS INP Aug08 * SG118 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 528 (17.4 days at current dive duration)
    projected end date: 28-Aug-2008 03:27:55 (to 5% capacity)

High voltage pack usage


Low voltage pack usage