AUTEC Apr08 * SG106 * Dive index * Mission links
Based on high voltage useage over previous 4 dives:
    dives remaining   : 769 (33.3 days at current dive duration)
    projected end date: 24-May-2008 08:45:21 (to 5% capacity)

High voltage pack usage


Low voltage pack usage