Shilshole 23Apr14 * SG218 * Dive index * Mission links
Based on high voltage useage over previous 1 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 23-Apr-2014 15:49:40 (to 15% capacity)

Based on high voltage useage over previous 1 dives:
    dives remaining   : 0 (0.0 days at current dive duration)
    projected end date: 23-Apr-2014 15:49:40 (to 15% capacity)

High voltage pack usage


Low voltage pack usage