Shilshole 13Mar15 * SG171 * Dive index * Mission links
Based on low voltage useage over previous 5 dives:
    dives remaining   : 2545 (88.0 days at current dive duration)
    projected end date: 09-Jun-2015 21:34:16 (to 15% capacity)

Based on high voltage useage over previous 5 dives:
    dives remaining   : 2784 (96.3 days at current dive duration)
    projected end date: 18-Jun-2015 03:54:52 (to 15% capacity)

High voltage pack usage


Low voltage pack usage