AUTEC 27Apr08 * SG118 * Dive index * Mission links
Based on low voltage useage over previous 10 dives:
    dives remaining   : 186 (4.7 days at current dive duration)
    projected end date: 04-May-2008 10:03:44 (to 5% capacity)

High voltage pack usage


Low voltage pack usage