DavisStrait May07 * SG001 * Dive index * Mission links * Dive 798 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.96 of 91.80 AH used of 24V (56.47% remains)
• Previous NAKs 2, Timeouts 0 • 16.17 of 61.20 AH used of 10V (73.58% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.1 m at 5.4 m depth, ceiling 3.3 m
• GPS1 time: 33 s
• GPS2 time: 18 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 626 - - - 2048 - -121.6 -43.60 - 2758 - - - - - - - - - - -
103 0.3 - 6 127 roll -1.07 6.75 - 2062 212.7 2.62 - 599 -553.1 -121.6 - - 2759 - - - - - - - - - - -
253 15.4 7.0 22 355 done -0.25 0.85 - 2276 251.8 - - 2471 - - 97.60 0.001 2268 -5.0 8.019 - - - - - - - - -
362 21.2 - 34 476 roll 1.07 1.77 - 2508 131.1 2.28 - 3763 566.7 121.6 99.38 0.001 1759 -5.1 11.238 - - - - - - - - -
SM 0.33 - - - - -7.34 - - 672 - - - 2006 - 200.41 49.40 - 1449 -6.3 INF - - - - - -