DavisStrait May07 * SG001 * Dive index * Mission links * Dive 797 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.91 of 91.80 AH used of 24V (56.53% remains)
• Previous NAKs 2, Timeouts 0 • 16.15 of 61.20 AH used of 10V (73.61% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 999.0 m at 5.5 m depth, ceiling -993.5 m
• GPS1 time: 14 s
• GPS2 time: 9 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 652 - - - 2026 - -121.6 -43.53 - 2759 - - - - - - - - - - -
102 0.7 -0.7 6 122 roll -1.07 6.75 - 2078 211.3 2.12 - 572 -685.8 -121.6 - - 2760 - - - - - - - - - - -
241 15.2 6.1 22 344 done -0.25 0.68 - 2258 264.7 - - 2512 - - 98.57 0.001 2260 -5.1 7.980 - - - - - - - - -
351 20.4 - 34 465 roll 1.07 1.40 - 2573 225.0 2.12 - 3786 600.9 121.6 98.97 0.001 1767 -5.0 10.518 - - - - - - - - -
SM 0.34 - - - - -7.52 - - 623 - - - 2056 - 200.90 49.83 0.001 1448 -6.4 0.222 - - - - - -