DavisStrait May07 * SG001 * Dive index * Mission links * Dive 784 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.29 of 91.80 AH used of 24V (57.20% remains)
• Previous NAKs 2, Timeouts 0 • 15.94 of 61.20 AH used of 10V (73.96% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 5.9 m at 6.0 m depth, ceiling 0.1 m
• GPS1 time: 25 s
• GPS2 time: 28 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 622 - - - 2036 - -121.6 -43.17 - 2756 - - - - - - - - - - -
103 0.3 - 6 128 roll -1.07 6.78 - 2070 213.6 2.62 - 583 -554.6 -121.6 - - 2754 - - - - - - - - - - -
229 15.3 7.8 19 332 done -0.25 0.90 - 2273 225.6 - - 2467 - - 97.78 0.001 2266 -5.0 7.903 - - - - - - - - -
339 20.9 - 31 454 roll 1.07 1.25 - 2524 200.8 2.53 - 3788 522.1 121.6 99.07 0.001 1774 -5.0 10.743 - - - - - - - - -
SM 0.33 - - - - -7.42 - - 648 - - - 2154 - 200.16 49.97 - 1445 -6.6 INF - - - - - -