DavisStrait May07 * SG001 * Dive index * Mission links * Dive 777 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 38.94 of 91.80 AH used of 24V (57.58% remains)
• Previous NAKs 2, Timeouts 0 • 15.82 of 61.20 AH used of 10V (74.15% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 999.0 m at 5.9 m depth, ceiling -993.1 m
• GPS1 time: 32 s
• GPS2 time: 27 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 659 - - - 2066 - -121.6 -43.58 - 2753 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 7.25 - 2090 197.4 2.83 - 637 -504.9 -121.6 - - 2765 - - - - - - - - - - -
241 15.4 6.3 22 343 done -0.25 0.65 - 2220 200.0 - - 2562 - - 98.93 0.001 2265 -5.1 8.056 - - - - - - - - -
350 20.6 - 34 464 roll 1.07 1.50 - 2573 235.3 2.33 - 3796 529.6 121.6 98.18 0.001 1759 -5.2 10.989 - - - - - - - - -
SM 0.34 - - - - -7.59 - - 613 - - - 2050 - 200.90 49.28 0.001 1450 -6.3 0.218 - - - - - -