DavisStrait May07 * SG001 * Dive index * Mission links * Dive 767 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 38.44 of 91.80 AH used of 24V (58.12% remains)
• Previous NAKs 0, Timeouts 0 • 15.66 of 61.20 AH used of 10V (74.42% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 1.9 m at 4.9 m depth, ceiling 3.0 m
• GPS1 time: 34 s
• GPS2 time: 26 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 621 - - - 2202 - -121.6 -43.50 - 2754 - - - - - - - - - - -
103 0.5 -0.2 6 127 roll -1.07 6.75 - 2054 212.3 2.88 - 735 -509.4 -121.6 - - 2752 - - - - - - - - - - -
253 15.3 7.1 22 361 done -0.25 1.33 - 2299 184.2 - - 2468 - - 97.53 0.001 2271 -4.9 7.810 - - - - - - - - -
367 21.3 - 34 483 roll 1.07 1.08 - 2568 249.1 2.33 - 3794 569.1 121.6 98.85 0.001 1769 -5.1 11.196 - - - - - - - - -
SM 0.33 - - - - -7.51 - - 617 - - - 1976 - 200.41 48.92 0.001 1440 -6.7 0.227 - - - - - -