DavisStrait May07 * SG001 * Dive index * Mission links * Dive 761 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 38.14 of 91.80 AH used of 24V (58.45% remains)
• Previous NAKs 2, Timeouts 0 • 15.56 of 61.20 AH used of 10V (74.58% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 3.9 m at 4.7 m depth, ceiling 0.8 m
• GPS1 time: 15 s
• GPS2 time: 26 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 651 - - - 2019 - -121.6 -43.25 - 2764 - - - - - - - - - - -
103 0.3 - 6 122 roll -1.07 6.78 - 2078 210.5 2.12 - 697 -623.6 -121.6 - - 2756 - - - - - - - - - - -
233 15.0 7.0 20 346 done -0.25 1.10 - 2298 200.0 - - 2476 - - 99.15 0.001 2249 -5.1 7.939 - - - - - - - - -
353 20.7 - 33 467 roll 1.07 1.17 - 2553 217.9 2.53 - 3798 522.5 121.6 98.18 0.001 1771 -4.9 10.431 - - - - - - - - -
SM 0.34 - - - - -7.57 - - 648 - - - 2061 - 200.66 49.88 0.001 1444 -6.6 0.228 - - - - - -