DavisStrait May07 * SG001 * Dive index * Mission links * Dive 740 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 37.08 of 91.80 AH used of 24V (59.61% remains)
• Previous NAKs 2, Timeouts 0 • 15.21 of 61.20 AH used of 10V (75.14% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 3.6 m at 5.9 m depth, ceiling 2.3 m
• GPS1 time: 32 s
• GPS2 time: 27 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 632 - - - 2037 - -121.6 -43.38 - 2756 - - - - - - - - - - -
102 0.5 -0.4 6 121 roll -1.07 6.80 - 2057 209.6 2.58 - 693 -520.9 -121.6 - - 2759 - - - - - - - - - - -
231 15.3 7.4 20 343 done -0.25 0.98 - 2260 207.1 - - 2587 - - 98.78 0.001 2264 -5.0 7.936 - - - - - - - - -
349 21.2 - 33 463 roll 1.07 1.27 - 2530 212.6 1.90 - 3796 636.3 121.6 98.10 0.001 1768 -5.1 11.094 - - - - - - - - -
SM 0.34 - - - - -7.47 - - 635 - - - 2022 - 200.41 49.92 - 1443 -6.5 INF - - - - - -