DavisStrait May07 * SG001 * Dive index * Mission links * Dive 732 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.69 of 91.80 AH used of 24V (60.03% remains)
• Previous NAKs 2, Timeouts 0 • 15.08 of 61.20 AH used of 10V (75.36% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.64 (beyond SM_CC=200) • surface range 7.5 m at 5.0 m depth, ceiling -2.5 m
• GPS1 time: 28 s
• GPS2 time: 35 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 649 - - - 2011 - -121.6 -43.40 - 2767 - - - - - - - - - - -
109 0.9 -1.1 6 132 roll -1.07 7.25 - 2078 197.1 2.95 - 743 -429.8 -121.6 - - 2763 - - - - - - - - - - -
201 15.4 8.3 15 313 done -0.25 1.38 - 2223 105.1 - - 2504 - - 98.90 0.001 2260 -5.1 8.107 - - - - - - - - -
320 20.8 - 28 433 roll 1.07 1.50 - 2549 217.3 2.15 - 3724 567.4 121.6 98.00 0.001 1769 -5.0 10.786 - - - - - - - - -
SM 0.33 - - - - -7.45 - - 645 - - - 2002 - 201.64 49.70 - 1443 -6.6 INF - - - - - -