DavisStrait May07 * SG001 * Dive index * Mission links * Dive 682 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.18 of 91.80 AH used of 24V (62.76% remains)
• Previous NAKs 2, Timeouts 0 • 14.25 of 61.20 AH used of 10V (76.71% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.1 m at 5.8 m depth, ceiling 3.7 m
• GPS1 time: 9 s
• GPS2 time: 16 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 652 - - - 2044 - -121.6 -43.83 - 2758 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 6.78 - 2073 209.6 2.42 - 542 -620.7 -121.6 - - 2758 - - - - - - - - - - -
259 15.3 6.3 24 371 done -0.25 0.75 - 2249 234.7 - - 2455 - - 97.20 0.001 2266 -5.1 8.016 - - - - - - - - -
378 20.6 - 37 491 roll 1.07 1.42 - 2553 214.1 2.35 - 3760 555.3 121.6 99.47 0.001 1762 -5.1 10.803 - - - - - - - - -
SM 0.33 - - - - -7.64 - - 603 - - - 1984 - 200.41 48.53 - 1441 -6.6 INF - - - - - -