DavisStrait May07 * SG001 * Dive index * Mission links * Dive 624 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.25 of 91.80 AH used of 24V (65.96% remains)
• Previous NAKs 2, Timeouts 0 • 13.30 of 61.20 AH used of 10V (78.27% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.0 m depth, ceiling -994.0 m
• GPS1 time: 16 s
• GPS2 time: 9 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 97 done -1.07 - - 593 - - - 2124 - -121.6 -43.53 - 2751 - - - - - - - - - - -
108 0.6 -0.6 6 129 roll -1.07 6.97 - 2102 216.5 2.62 - 634 -568.7 -121.6 - - 2758 - - - - - - - - - - -
240 15.1 5.8 21 347 done -0.25 0.70 - 2266 234.3 - - 2398 - - 97.97 0.001 2254 -5.1 8.040 - - - - - - - - -
354 20.0 - 33 471 roll 1.07 1.38 - 2543 200.7 2.53 - 3791 550.6 121.6 98.62 0.001 1760 -5.0 10.369 - - - - - - - - -
SM 0.33 - - - - -7.52 - - 626 - - - 2050 - 200.66 49.65 - 1445 -6.3 INF - - - - - -