DavisStrait May07 * SG001 * Dive index * Mission links * Dive 464 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 23.30 of 91.80 AH used of 24V (74.61% remains)
• Previous NAKs 0, Timeouts 0 • 10.67 of 61.20 AH used of 10V (82.56% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 6.6 m at 5.6 m depth, ceiling -1.0 m
• GPS1 time: 26 s
• GPS2 time: 11 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 612 - - - 2072 - -121.6 -43.47 - 2763 - - - - - - - - - - -
101 0.3 - 6 126 roll -1.07 8.20 - 2079 178.9 2.33 - 616 -624.9 -121.6 - - 2757 - - - - - - - - - - -
260 15.0 6.3 24 370 done -0.25 0.65 - 2241 249.2 - - 2546 - - 99.40 0.001 2260 -5.0 7.763 - - - - - - - - -
377 20.4 - 37 489 roll 1.07 1.48 - 2560 215.5 2.47 - 3796 506.1 121.6 98.20 0.001 1770 -5.0 10.536 - - - - - - - - -
SM 0.34 - - - - -7.53 - - 622 - - - 2009 - 200.16 48.33 0.001 1450 -6.6 0.230 - - - - - -