DavisStrait May07 * SG001 * Dive index * Mission links * Dive 463 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 23.26 of 91.80 AH used of 24V (74.66% remains)
• Previous NAKs 0, Timeouts 0 • 10.66 of 61.20 AH used of 10V (82.59% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.2 m depth, ceiling -993.8 m
• GPS1 time: 11 s
• GPS2 time: 23 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 105 done -1.07 - - 612 - - - 2160 - -121.6 -43.67 - 2760 - - - - - - - - - - -
111 1.5 -1.6 7 131 roll -1.07 7.03 - 2082 209.1 2.38 - 844 -552.9 -121.6 - - 2761 - - - - - - - - - - -
198 15.5 8.9 16 309 done -0.25 0.77 - 2249 216.9 - - 2591 - - 98.65 0.001 2264 -5.0 8.082 - - - - - - - - -
315 20.8 - 29 427 roll 1.07 1.40 - 2546 212.1 2.22 - 3788 539.2 121.6 98.55 0.001 1767 -5.0 10.857 - - - - - - - - -
SM 0.34 - - - - -7.58 - - 619 - - - 2061 - 200.16 48.60 0.001 1445 -6.6 0.230 - - - - - -