DavisStrait May07 * SG001 * Dive index * Mission links * Dive 206 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 10.51 of 91.80 AH used of 24V (88.55% remains)
• Previous NAKs 0, Timeouts 0 • 6.48 of 61.20 AH used of 10V (89.41% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 1.7 m at 5.7 m depth, ceiling 4.0 m
• GPS1 time: 8 s
• GPS2 time: 20 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 591 - - - 2078 - -121.6 -43.42 - 2759 - - - - - - - - - - -
101 0.5 -0.3 6 124 roll -1.07 7.28 - 2066 202.6 2.62 - 570 -575.6 -121.6 - - 2754 - - - - - - - - - - -
236 15.1 7.0 21 346 done -0.25 0.95 - 2284 229.5 - - 2463 - - 99.05 0.001 2262 -5.0 7.763 - - - - - - - - -
353 20.8 - 34 464 roll 1.07 1.20 - 2543 215.8 2.33 - 3785 567.4 121.6 98.22 0.001 1764 -5.1 10.915 - - - - - - - - -
SM 0.34 - - - - -7.59 - - 598 - - - 2186 - 200.66 48.88 - 1446 -6.5 INF - - - - - -