DavisStrait May07 * SG001 * Dive index * Mission links * Dive 194 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 9.90 of 91.80 AH used of 24V (89.21% remains)
• Previous NAKs 2, Timeouts 0 • 6.29 of 61.20 AH used of 10V (89.72% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.15 (beyond SM_CC=200) • surface range 4.8 m at 5.4 m depth, ceiling 0.6 m
• GPS1 time: 30 s
• GPS2 time: 12 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 612 - - - 2077 - -121.6 -43.45 - 2768 - - - - - - - - - - -
102 0.5 -0.4 6 127 roll -1.07 7.38 - 2081 199.1 3.28 - 770 -398.5 -121.6 - - 2760 - - - - - - - - - - -
234 15.1 7.6 20 343 done -0.25 0.88 - 2265 209.1 - - 2515 - - 98.95 0.001 2267 -5.0 7.787 - - - - - - - - -
350 21.1 - 33 461 roll 1.07 1.25 - 2531 212.8 2.72 - 3793 469.9 121.6 97.90 0.001 1760 -5.2 11.310 - - - - - - - - -
SM 0.34 - - - - -7.56 - - 622 - - - 2073 - 201.15 49.85 - 1443 -6.4 INF - - - - - -