DavisStrait May07 * SG001 * Dive index * Mission links * Dive 142 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 7.28 of 91.80 AH used of 24V (92.07% remains)
• Previous NAKs 2, Timeouts 0 • 5.46 of 61.20 AH used of 10V (91.07% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.39 (beyond SM_CC=200) • surface range 999.0 m at 5.6 m depth, ceiling -993.4 m
• GPS1 time: 12 s
• GPS2 time: 11 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 94 done -1.07 - - 653 - - - 2036 - -121.6 -43.65 - 2759 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 6.78 - 2073 209.4 2.33 - 602 -615.5 -121.6 - - 2753 - - - - - - - - - - -
256 15.6 6.9 24 365 done -0.25 0.85 - 2269 230.6 - - 2531 - - 98.72 0.001 2269 -4.9 7.916 - - - - - - - - -
372 20.9 - 37 482 roll 1.07 1.20 - 2555 238.3 2.83 - 3789 444.5 121.6 98.72 0.001 1776 -5.0 10.803 - - - - - - - - -
SM 0.34 - - - - -7.43 - - 630 - - - 2066 - 201.39 49.28 - 1447 -6.7 INF - - - - - -