DavisStrait May07 * SG001 * Dive index * Mission links * Dive 892 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 47.10 of 91.80 AH used of 24V (48.70% remains)
• Previous NAKs 0, Timeouts 0 • 18.05 of 61.20 AH used of 10V (70.51% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.4 m depth, ceiling -993.6 m
• GPS1 time: 29 s
• GPS2 time: 37 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 596 - - - 2077 - -121.6 -43.50 - 2752 - - - - - - - - - - -
103 0.7 -0.6 6 126 roll -1.07 6.75 - 2061 217.0 2.20 - 557 -690.9 -121.6 - - 2757 - - - - - - - - - - -
236 15.3 7.7 20 349 done -0.25 0.85 - 2258 231.8 - - 2463 - - 99.15 0.001 2264 -5.0 7.874 - - - - - - - - -
355 21.2 - 33 470 roll 1.07 1.35 - 2534 204.4 2.53 - 3791 524.9 121.6 97.75 0.001 1767 -5.1 11.156 - - - - - - - - -
SM 0.34 - - - - -7.49 - - 633 - - - 2034 - 200.16 49.70 0.001 1452 -6.3 0.220 - - - - - -