DavisStrait May07 * SG001 * Dive index * Mission links * Dive 889 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 46.95 of 91.80 AH used of 24V (48.85% remains)
• Previous NAKs 2, Timeouts 0 • 18.00 of 61.20 AH used of 10V (70.59% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.3 m at 5.8 m depth, ceiling 3.5 m
• GPS1 time: 22 s
• GPS2 time: 27 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 638 - - - 2085 - -121.6 -43.55 - 2758 - - - - - - - - - - -
103 0.4 -0.1 6 123 roll -1.07 6.93 - 2041 202.5 2.92 - 621 -501.4 -121.6 - - 2754 - - - - - - - - - - -
223 15.5 8.3 19 326 done -0.25 0.85 - 2273 272.9 - - 2526 - - 99.32 0.001 2261 -5.0 7.963 - - - - - - - - -
332 21.3 - 31 448 roll 1.07 1.25 - 2534 208.8 2.03 - 3792 623.6 121.6 98.38 0.001 1767 -5.0 11.070 - - - - - - - - -
SM 0.33 - - - - -7.59 - - 618 - - - 2036 - 200.41 49.40 0.001 1443 -6.6 0.221 - - - - - -