DavisStrait May07 * SG001 * Dive index * Mission links * Dive 887 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 46.86 of 91.80 AH used of 24V (48.96% remains)
• Previous NAKs 2, Timeouts 0 • 17.97 of 61.20 AH used of 10V (70.64% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.15 (beyond SM_CC=200) • surface range 999.0 m at 5.9 m depth, ceiling -993.1 m
• GPS1 time: 9 s
• GPS2 time: 14 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 640 - - - 2061 - -121.6 -43.60 - 2759 - - - - - - - - - - -
103 0.6 -0.5 6 127 roll -1.07 6.72 - 2084 214.9 2.22 - 573 -670.3 -121.6 - - 2757 - - - - - - - - - - -
260 15.1 6.2 23 363 done -0.25 0.68 - 2239 227.9 - - 2339 - - 98.90 0.001 2260 -5.0 7.821 - - - - - - - - -
370 20.8 - 35 484 roll 1.07 1.42 - 2582 241.5 3.08 - 3780 467.9 121.6 98.72 0.001 1761 -5.1 10.836 - - - - - - - - -
SM 0.34 - - - - -7.54 - - 640 - - - 2038 - 201.15 49.70 0.001 1445 -6.4 0.221 - - - - - -