DavisStrait May07 * SG001 * Dive index * Mission links * Dive 884 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 46.72 of 91.80 AH used of 24V (49.11% remains)
• Previous NAKs 2, Timeouts 0 • 17.92 of 61.20 AH used of 10V (70.73% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 4.0 m at 5.7 m depth, ceiling 1.7 m
• GPS1 time: 20 s
• GPS2 time: 7 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 650 - - - 2043 - -121.6 -43.35 - 2760 - - - - - - - - - - -
102 0.3 - 6 121 roll -1.07 6.78 - 2102 214.2 2.40 - 600 -601.2 -121.6 - - 2758 - - - - - - - - - - -
270 15.0 6.2 26 373 done -0.25 0.62 - 2252 241.9 - - 2477 - - 98.97 0.001 2263 -5.0 7.765 - - - - - - - - -
379 20.2 - 38 494 roll 1.07 1.40 - 2502 178.6 2.22 - 3785 589.2 121.6 97.80 0.001 1764 -5.1 10.667 - - - - - - - - -
SM 0.34 - - - - -7.53 - - 644 - - - 2039 - 200.16 49.67 0.001 1444 -6.4 0.224 - - - - - -