DavisStrait May07 * SG001 * Dive index * Mission links * Dive 878 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 46.44 of 91.80 AH used of 24V (49.41% remains)
• Previous NAKs 2, Timeouts 0 • 17.82 of 61.20 AH used of 10V (70.89% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 4.1 m at 5.6 m depth, ceiling 1.5 m
• GPS1 time: 20 s
• GPS2 time: 26 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 634 - - - 2044 - -121.6 -43.62 - 2756 - - - - - - - - - - -
103 0.7 -0.8 6 122 roll -1.07 7.28 - 2098 201.1 2.12 - 605 -678.8 -121.6 - - 2762 - - - - - - - - - - -
257 15.4 5.4 24 368 done -0.25 0.68 - 2261 239.7 - - 2597 - - 99.12 0.001 2258 -5.1 8.105 - - - - - - - - -
374 20.5 - 36 490 roll 1.07 1.12 - 2526 236.6 2.45 - 3797 489.8 121.6 98.70 0.001 1763 -5.0 10.641 - - - - - - - - -
SM 0.33 - - - - -7.47 - - 634 - - - 2187 - 200.66 48.95 0.001 1451 -6.4 0.215 - - - - - -