DavisStrait May07 * SG001 * Dive index * Mission links * Dive 876 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 46.35 of 91.80 AH used of 24V (49.51% remains)
• Previous NAKs 2, Timeouts 0 • 17.78 of 61.20 AH used of 10V (70.94% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 5.0 m at 5.8 m depth, ceiling 0.8 m
• GPS1 time: 18 s
• GPS2 time: 11 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 618 - - - 2032 - -121.6 -43.53 - 2757 - - - - - - - - - - -
104 0.6 -0.6 6 124 roll -1.07 6.90 - 2070 210.4 2.50 - 564 -587.2 -121.6 - - 2758 - - - - - - - - - - -
236 15.2 7.6 20 349 done -0.25 0.95 - 2277 217.9 - - 2471 - - 98.78 0.001 2254 -5.1 8.027 - - - - - - - - -
356 21.2 - 33 470 roll 1.07 1.27 - 2522 192.9 2.33 - 3797 569.1 121.6 98.68 0.001 1762 -5.0 10.940 - - - - - - - - -
SM 0.34 - - - - -7.56 - - 619 - - - 2044 - 200.66 49.25 - 1442 -6.5 INF - - - - - -