DavisStrait May07 * SG001 * Dive index * Mission links * Dive 871 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 46.11 of 91.80 AH used of 24V (49.77% remains)
• Previous NAKs 2, Timeouts 0 • 17.70 of 61.20 AH used of 10V (71.08% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.9 m at 5.5 m depth, ceiling 2.6 m
• GPS1 time: 24 s • bottom range 5.5 m at 6.5 m, depth 12 m (15 m grid)
• GPS2 time: 25 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 634 - - - 2182 - -121.6 -43.50 - 2755 - - - - - - - - - - -
103 0.5 -0.4 6 127 roll -1.07 7.03 - 2069 204.1 3.03 - 574 -530.7 -121.6 - - 2757 - - - - - - - - - - -
155 9.7 13.4 9 258 done -0.25 1.05 - 2240 162.9 - - 2443 - - 97.85 0.001 2254 -5.1 5.161 - - - - - - - - -
265 15.3 - 21 369 roll 1.07 1.45 - 2550 213.8 2.80 - 3786 479.6 121.6 93.85 0.001 1757 -5.3 8.386 - - - - - - - - -
SM 0.34 - - - - -7.56 - - 613 - - - 2046 - 200.16 49.28 - 1443 -6.4 INF - - - - - -