DavisStrait May07 * SG001 * Dive index * Mission links * Dive 866 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 45.86 of 91.80 AH used of 24V (50.04% remains)
• Previous NAKs 2, Timeouts 0 • 17.62 of 61.20 AH used of 10V (71.22% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.8 m at 5.0 m depth, ceiling 2.2 m
• GPS1 time: 19 s
• GPS2 time: 23 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 615 - - - 2048 - -121.6 -43.65 - 2756 - - - - - - - - - - -
103 0.6 -0.6 6 123 roll -1.07 7.05 - 2076 207.2 2.75 - 714 -485.1 -121.6 - - 2755 - - - - - - - - - - -
235 15.0 6.8 20 349 done -0.25 1.27 - 2280 160.6 - - 2588 - - 98.50 0.001 2263 -5.0 7.755 - - - - - - - - -
356 20.8 - 33 471 roll 1.07 1.25 - 2548 214.4 2.22 - 3786 539.6 121.6 99.80 0.001 1764 -5.0 10.764 - - - - - - - - -
SM 0.34 - - - - -7.36 - - 640 - - - 2037 - 200.16 49.17 - 1447 -6.4 INF - - - - - -