DavisStrait May07 * SG001 * Dive index * Mission links * Dive 836 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 43.99 of 91.80 AH used of 24V (52.08% remains)
• Previous NAKs 2, Timeouts 0 • 17.02 of 61.20 AH used of 10V (72.19% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 7.4 m at 4.7 m depth, ceiling -2.7 m
• GPS1 time: 29 s
• GPS2 time: 23 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
55 - - - 153 done -1.07 - - 618 - - - 3282 - -121.6 -85.75 - 2750 - - - - - - - - - - -
161 2.5 -2.4 12 182 roll -1.07 6.75 - 2091 218.2 4.12 - 644 -640.3 -121.6 - - 2191 - - - - - - - - - - -
341 15.2 1.8 32 471 done -0.25 0.77 - 2249 205.2 - - 2533 - - 85.28 0.001 2259 0.8 -1.254 - - - - - - - - -
477 18.0 - 47 661 VBD 1.07 1.50 - 2577 218.7 - - 2534 - 121.6 128.25 0.001 1912 -2.7 5.041 - - - - - - - - -
SM 0.34 - - - - -7.53 - - 614 - - - 2110 - 200.41 73.75 - 1449 -6.3 INF - - - - - -