DavisStrait May07 * SG001 * Dive index * Mission links * Dive 828 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 42.98 of 91.80 AH used of 24V (53.18% remains)
• Previous NAKs 2, Timeouts 0 • 16.82 of 61.20 AH used of 10V (72.51% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 450.62 (beyond SM_CC=200) • surface range 1.0 m at 0.3 m depth, ceiling -0.7 m
• GPS1 time: 24 s
• GPS2 time: 18 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 159 done -1.07 - - 624 - - - 1132 - -121.6 -98.93 - 2744 - - - - - - - - - - -
165 0.6 -0.3 13 178 done -1.07 0.32 - 680 175.0 - - 1132 - -121.6 - - 2802 - - - - - - - - - - -
1050 0.3 -45.6 15 1059 VBD - - - 682 - - - 1879 - - -7.18 - 681 295.4 - - - - - - - - - -