DavisStrait May07 * SG001 * Dive index * Mission links * Dive 82 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 4.26 of 91.80 AH used of 24V (95.36% remains)
• Previous NAKs 0, Timeouts 0 • 4.51 of 61.20 AH used of 10V (92.64% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 6.9 m at 5.7 m depth, ceiling -1.2 m
• GPS1 time: 13 s
• GPS2 time: 21 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
48 - - - 104 done -1.07 - - 644 - - - 2051 - -121.6 -43.58 - 2749 - - - - - - - - - - -
110 1.5 -1.6 7 130 roll -1.07 6.75 - 2079 212.6 2.80 - 583 -524.3 -121.6 - - 2756 - - - - - - - - - - -
196 15.4 8.7 16 304 done -0.25 1.20 - 2199 100.0 - - 2474 - - 97.93 0.001 2258 -5.1 8.106 - - - - - - - - -
310 20.7 - 29 420 roll 1.07 1.75 - 2551 201.1 2.65 - 3780 492.8 121.6 98.45 0.001 1769 -5.0 10.642 - - - - - - - - -
SM 0.34 - - - - -7.39 - - 651 - - - 2043 - 200.16 48.85 - 1449 -6.6 INF - - - - - -