DavisStrait May07 * SG001 * Dive index * Mission links * Dive 800 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 40.12 of 91.80 AH used of 24V (56.29% remains)
• Previous NAKs 0, Timeouts 0 • 16.22 of 61.20 AH used of 10V (73.49% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
• surface range 3.5 m at 0.3 m depth, ceiling -3.2 m
• GPS1 time: 26 s
• GPS2 time: 19 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
55 - - - 138 done -1.07 - - 671 - - - 3726 - -121.6 -78.95 - 2709 - - - - - - - - - - -
145 1.4 -1.0 10 167 roll -1.07 6.78 - 2081 208.0 5.15 - 690 -589.5 -121.6 - - 2222 - - - - - - - - - - -
474 0.3 -0.7 50 491 VBD -0.25 0.77 - 2263 236.4 - - 2568 - - 8.00 0.001 2363 17.6 -0.547 - - - - - - - - -
506 0.3 -0.1 51 515 roll - - - 2260 - 1.67 - 3018 269.5 - -2.83 - 2367 -1.4 - - - - - - - - - -
537 0.3 - 52 544 VBD - - - 2262 - - - 3020 - - 6.20 0.001 2562 31.5 -0.977 - - - - - - - - -