DavisStrait May07 * SG001 * Dive index * Mission links * Dive 796 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.87 of 91.80 AH used of 24V (56.57% remains)
• Previous NAKs 2, Timeouts 0 • 16.14 of 61.20 AH used of 10V (73.63% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 2.0 m at 5.7 m depth, ceiling 3.7 m
• GPS1 time: 23 s
• GPS2 time: 37 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 642 - - - 2047 - -121.6 -43.53 - 2764 - - - - - - - - - - -
102 0.3 - 6 126 roll -1.07 6.78 - 2080 212.1 2.60 - 600 -556.5 -121.6 - - 2759 - - - - - - - - - - -
236 15.1 7.0 20 349 done -0.25 0.88 - 2214 152.3 - - 2588 - - 99.25 0.001 2262 -5.0 7.826 - - - - - - - - -
355 20.8 - 33 470 roll 1.07 1.52 - 2565 230.9 2.12 - 3799 571.2 121.6 98.70 0.001 1766 -5.0 10.819 - - - - - - - - -
SM 0.34 - - - - -7.37 - - 661 - - - 2034 - 200.66 49.22 - 1449 -6.4 INF - - - - - -