DavisStrait May07 * SG001 * Dive index * Mission links * Dive 794 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.77 of 91.80 AH used of 24V (56.68% remains)
• Previous NAKs 2, Timeouts 0 • 16.10 of 61.20 AH used of 10V (73.69% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 6.1 m at 5.8 m depth, ceiling -0.3 m
• GPS1 time: 14 s
• GPS2 time: 27 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 646 - - - 2061 - -121.6 -43.50 - 2759 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 6.75 - 2076 211.9 2.60 - 637 -547.7 -121.6 - - 2762 - - - - - - - - - - -
267 15.1 6.7 25 379 done -0.25 1.17 - 2178 87.2 - - 2397 - - 98.78 0.001 2258 -5.1 7.974 - - - - - - - - -
385 20.9 - 38 500 roll 1.07 2.25 - 2564 171.6 3.33 - 3790 418.3 121.6 97.82 0.001 1771 -5.0 10.770 - - - - - - - - -
SM 0.34 - - - - -7.62 - - 611 - - - 2165 - 200.66 49.50 - 1445 -6.6 INF - - - - - -